DEVELOPMENT OF METHODOLOGY FOR CAPACITY CALCULATION IN THE SECTIONS WITH AN INTERMEDIATE JUNCTION
Klíčová slova:
capacity calculation, crossing or overtaking section, junction, CPM method, critical path, headwayAbstrakt
This article deals with the methodology of capacity calculation in the crossing or overtaking sections with one or more junctions. The basic methodology adumbrated in (1) is developed with emphasis on thorough specification of input data and the process of setting total time of occupancy of observed line with successive trains.
Stažení
Reference
Stažení
Publikováno
Číslo
Sekce
Licence
Copyright (c) 2020 Petr Veselý##common.commaListSeparator##Petr Krýže

Tato práce je licencována pod Mezinárodní licencí Creative Commons Attribution 4.0 .
