DEVELOPMENT OF METHODOLOGY FOR CAPACITY CALCULATION IN THE SECTIONS WITH AN INTERMEDIATE JUNCTION

Autoři

  • Petr Veselý
  • Petr Krýže

Klíčová slova:

capacity calculation, crossing or overtaking section, junction, CPM method, critical path, headway

Abstrakt

This article deals with the methodology of capacity calculation in the crossing or overtaking sections with one or more junctions. The basic methodology adumbrated in (1) is developed with emphasis on thorough specification of input data and the process of setting total time of occupancy of observed line with successive trains.

Stažení

Údaje o počtu stažení nejsou zatím k dispozici.

Reference

Publikováno

2011-12-30

Číslo

Sekce

Články

Jak citovat

DEVELOPMENT OF METHODOLOGY FOR CAPACITY CALCULATION IN THE SECTIONS WITH AN INTERMEDIATE JUNCTION. (2011). Perner’s Contacts, 6(4), 300-307. https://ojs-demo.upce.cz/index.php/perner/article/view/932

Podobné články

1-10 z 116

Můžete také začít rozšířené hledání podobnosti pro tento článek.

Nejaktuálnější články stejného autora (stejných autorů)