DETERMINATION OF THE NUMBER OF PERIODIC AND UNDPLANNED REPAIRS CAUSED BY VIOLENT DAMAGE ON RAILWAY TRACTION VEHICLES FOR NEWLY PROPOSED REPAIR SHOP

Authors

  • Jiří Strnisko

Keywords:

mooring repairs, major repairs, violent damage, repair

Abstract

This article is realized in order to establish a theoretic number of the periodic  inspections and repairs caused by violent damage on railway locomotives of the  major transport companies in the Czech Republic. We analyzed the most  remarkable cases of them. These calculations will be useful as input data for a  mathematical model for finding a suitable location of the ¨proposed repair facility  and also it will be applied for determination of capacity calculations.

Downloads

Download data is not yet available.

References

Downloads

Published

2010-04-19

Issue

Section

Articles

How to Cite

DETERMINATION OF THE NUMBER OF PERIODIC AND UNDPLANNED REPAIRS CAUSED BY VIOLENT DAMAGE ON RAILWAY TRACTION VEHICLES FOR NEWLY PROPOSED REPAIR SHOP. (2010). Perner’s Contacts, 5(1), 243-254. https://ojs-demo.upce.cz/index.php/perner/article/view/961

Similar Articles

1-10 of 98

You may also start an advanced similarity search for this article.